We reached 100 days in on 6.21.16. I thought it would be fun to do a List of 100 tasks completed since the journey began.
- 12.25.15 IT ALL BEGAN when I discovered the listing of 609 on Realtor.com.
- 12.26.15 First showing of 609 meet Realtor, Maggie Coleman at 4:15pm for a walk-thru.
- 12.29.15 Put in an Offer on 609.
- 1.5.16 Offer gets Denied on 609.
- 1.6.16 Up the offer on 609.
- 1.25.16 Bank Accepted Offer on 609.
- 1.26.16 Choose to list 358 with ReMax Sold Team.
- 2.12.16 Meet the Stager for 358.
- 2.16.16 Start Packing up 358.
- 2.26.16 Real Estate Inspection on 609.
- 3.1.16 Start the design609 BLOG Post#1:The Beginning #2:The Journey Begins.
- 3.2.16 BLOG Post#3:The Inspection #4:The Stager #5:Think Color.
- 3.3.16 BLOG Post#6:Old/Next #7:Before the Inspection #8:Let’s Get Help.
- 3.10.16 BLOG Post#10 It’s Not Black and White.
- 3.13.16 Complete 358 Listing Paperwork.
- 3.14.16 CLOSING DAY for 609.
- 3.16.16 Water Authority turns on the water at 609.
- 3.18.16 Dave Witzel takes Professional Photos of 358.
- 3.19.16 Orville’s Delivers our new appliances at 609.
- 3.19.16 Dish Network installs the satellite dish at 609.
- 3.19.16 Start to move into 609.
- 3.19.16 Scrub 609.
- 3.20.16 Stage 358.
- 3.20.16 Michael replaces the gold exterior light fixtures with oil-rubbed bronze exterior light fixtures at 609.
- 3.20.16 Michael replaces the gold exterior lamppost light fixture with an oil-rubbed bronze exterior lamppost light fixture at 609.
- 3.20.16 Aaron paints (2)Guest Bedrooms walls and ceilings Valspar Malted Milk 7003-9 at 609.
- 3.21.16 Set up (2) Guest Bedrooms at 609.
- 3.21.16 Don and Jimmy fix the Living Room ceiling damage at 609.
- 3.21.16 Time Warner installs a new cable line at 609.
- 3.22.16 Michael replaces gold doorknobs with oil-rubbed bronze doorknobs at 609.
- 3.23.16 Michael replaces old dimmer light switches with new dimmer light switches at 609.
- 3.23.16 Michael replaces all old cover plates with new cover plated at 609.
- 3.24.16 Michael replaces all 34 recessed ceiling lights with new LED lights.
- 3.24.16 Orville’s installs a gas line for the new stove at 609.
- 3.24.16 Aaron paints Dining room walls Benjamin Moore Byzantine Gold 1099 and ceiling Valspar Malted Milk 7003-9 at 609.
- 3.24.16 Insurance inspection at 609
- 3.24.16 BLOG Post#11 Too Pooped to Putter
- 3.25.16 Aaron paints Office Behr Cracked Pepper PPU-19-1 and ceiling Valspar Malted Milk 7003-9 at 609.
- 3.25.16 BLOG Post#12 It’s Just Paint.
- 3.26.16 OPEN HOUSE at 358.
- 3.26.16 Accept an Offer at 358.
- 3.26.16 BLOG Post#13 Pass the Pepper.
- 3.26.16 Lonnie and Crew paint the Kilz over Wallpaper in Kitchen, Butler’s Pantry, Laundry Room and Master Bedroom at 609.
- 3.27.16 Offer dies at 358.
- 3.28.16 BLOG Post#14 Two Weeks In.
- 3.28.16 Accept a new offer at 358.
- 4.2.16 Lonnie and Crew paint the Kitchen, Butler’s Pantry and Back Stairwell walls Benjamin Moore Bridgewater Tan 1096 and ceilings Valspar Malted Milk 7003-9 at 609.
- 4.2.16 Purchase Dining Room Table from DL Home and Garden for 609.
- 4.2.16 Ernie Swan from Swan Tile gives a Quote for the brick floor at 609.
- 4.2.16 Lonnie and Crew paint the Living Room walls and ceiling Valspar Malted Milk 7003-9at 609.
- 4.3.16 Michael installs the ceiling fan in the Livingroom at 609.
- 4.4.16 BLOG Post#15 Week 3.
- 4.5.16 Aaron paints Master Bedroom walls Valspar Homestead Ballroom Gold 3003-7C at 609.
- 4.6.16 Aaron paints the Laundry Room Vaspar Mark Twain House Ombra Gray 4004-2A a National Trust for Historic Preservation Color at 609.
- 4.6.16 Ernie Swan installs the hardy board for the brick floor at 609.
- 4.9.16 Ernie Swan starts laying the brick floor at 609.
- 4.10.16 Oil the grates and burners for the first time at 609.
- 4.11.16 Ernie Swan grouts the brick floor at 609.
- 4.11.16 Order from Bassett a Bed frame for Master Bedroom at 609.
- 4.13.16 Ernie Swan completes the brick floor at 609!!!!
- 4.13.16 Chris Di Giovanni from Hidden Valley cleans up the yard at 609.
- 4.15.16 DL Home and Garden delivers the Dining Room Table at 609!!!!
- 4.18.16 BLOG Post#16:Week 4.
- 4.24.16 Order from Bassett a Coffee table for Living Room at 609.
- 4.24.16 Order from Bassett a Dresser and a Mirror for Master Bedroom at 609.
- 4.25.16 BLOG Post#17:Weeks 5&6.
- 4.26.16 Metro Mattress delivers the new Tempur-Pedic king size bed for Master Bedroom at 609.
- 4.26.16 Move into Master Bedroom.
- 4.26.16 Michael and Austin open up the wall, lay plywood and frame for Amanda’s Closet at 609.
- 4.27.16 Michael and Austin drywall, sand and mud Amanda’s closet at 609.
- 4.28.16 Aaron paints Amanda’s Closet at 609.
- 4.29.16 Aaron paints Amanda’s Suite at 609.
- 4.30.16 Amanda moves into her suite.
- 5.4.16 BLOG Post#18:Week 7.
- 5.19.16 Aaron paints the Sun room walls Benjamin Moore Green Tea#236 and ceiling Malted Milk at 609.
- 5.20.16 Aaron paints the Kitchen Hearth Benjamin Moore Urban Legend #238 at 609.
- 5.20.16 We finally find new toilet seat covers that match the toilets.
- 5.23.16 Rochester Premier Roofing starts the roof at 609.
- 5.24.16 Daniel Tree Trimming Trims the Japanese Maple at 609.
- 5.24.16 Sign the Closing Paperwork for 358.
- 5.25.16 BLOG Post#19:Weeks The Month of May 8, 9, 10.
- 5.26.16 Bruce from Fawn Meadow meets to quote fireplace redo at 609.
- 5.27.16 Rochester Premiere Roofing finishes the roof at 609.
- 6.1.16 Select wallpaper for the entry at 609.
- 6.2.16 BLOG Post#20:What’s Next? #21:Here Comes the Rain.
- 6.8.16 BLOG Post#22:What a Gorgeous Morning.
- 6.9.16 BLOG Post#23:In Bloom.
- 6.9.16 Bruce from Fawn Meadow presents fireplace quote at 609.
- 6.12.16 Install new entry chandelier at 609.
- 6.12.16 Spray paint old chandelier and install it in the Kitchen at 609.
- 6.12.16 Order new shades for the old chandelier at 609.
- 6.14.16 BLOG Post#24:Baby Steps.
- 6.14.16 MCM Stone comes to template for granite counter tops.
- 6.21.16 100 Days in at 609.
- 6.23.16 Daniel Tree Trimming starts their work at 609 removing trees.
- 6.24.16 Daniel Tree Trimming finishes their work at 609 trimming shrubs.
- 7.1.16 The new Stainless Steel Range hood gets delivered.
- 7.1.16 The granite counter tops get installed at 609.
- 7.2.16 Michael installs Faucets in the kitchen and bar sink.
- 7.2.16 BLOG Post#25:100 Days (oops, it never posted until 7.12.16.
As we began on our adventure transforming the house where ‘Laura Ashley threw-up’; we decided we needed a professional’s opinion. Not that kind of professional; although it might be a good idea; anyone know of a good doctor? We called in a Handyman, a Wallpaper-Paint Pro.
